AG真人国际(中国)官方网站

Stock Code:
A 000055
B 200055
济南市
Jinan Metro Line 2
A total of 36 sides of 18 underground stations of Jinan R2 line phase I are equipped with full height adjustable ventilation platform door system, and a total of 2 sides of 1 elevated station are equipped with half height platform door system.
济南R2线一期工程西起王府庄站,东至彭家庄站,共设车站19座。彭家庄站为高架站,其余车站均为地下车站。
济南R2线一期18座地下车站共36侧设置全高可调通风型站台门系统,1座高架车站共2侧设置半高站台门系统。

Previous project

Shenzhen Metro Line 2

Next project

Hong Kong Shatin central line

Copyright ©2021 Fangda Group Co., Ltd All Right Reserved. 粤ICP备05036140号-1
友情链接: